Nokia Siemens Network

Customer: Nokia Siemens Network
Project: TOT-NSN RNC & NodeB Implementation
Location: Bangkok & Metropolitan Area
Time: 2013
Brief: Handling RNC configuration and Nodeb installation plus commissioning under Ericsson equipment.

Nokia Siemens Network

Customer: Nokia Siemens Network
Project: AWN 3G NodeB Implementation
Location: East of Thailand
Time: 2013 - 2015
Brief: Turnkey project ; deploying Nokia NodeB equipment E2E process.

AIS

Customer: AIS
Project: AWN WIFI Off-load
Location: East of Thailand
Time: 2014 - present
Brief: Installing access point for WIFI network to reduce load of 3G mobile service.

AIS

Customer: AIS
Project: E1 Co-operate Link
Location: Bangkok & Metropoliatan Area
Time: 2014-2016
Brief: Installing access point(AP) for WIFI network to reduce load of 3G mobile service.

AIS

Customer: AIS
Project: AWN LTE E-NodeB
Location: Central&West of Thailand
Time: 2015
Brief: Performing Huawei Enhanced-NodeB Implementation; installing and commissioning.

AIS

Customer: AIS
Project: 2G&3G Optimization
Location: East of Thailand
Time: 2015-Present
Brief: Improving the quality of signal by RF optimizing order.

 

NOKIA

Customer: Nokia
Project: SBN Outside Plant
Location: East and South of Thailand
Time: 2015-Present
Brief: Laying optical cable for back-bone and mobile branch network.

AIS

Customer: AIS
Project: FTTB Plum Condo (Pruksa)
Location: East of Thailand
Time: 2015
Brief: Laying optical cable into the room of condominium and setting up the terminal for ONT.

NOKIA

Customer: Nokia
Project: AWN FTTx
Location: East and South of Thailand
Time: 2015-Present
Brief: Turnkey project; performing E2E implementation e.g. survey, design, cabling, splicing.

NOKIA

Customer: Nokia
Project: AWN 3G&LTE NodeB implementation
Location: East of Thailand
Time: 2015-Present
Brief: Implementing NodeB end to end process; TSSR, Installation, Commissioning and Integration.

NOKIA

Customer: Nokia
Project: AWN PTT&Amazon Link
Location: Bangkok Metropolitan Area and East of Thailand
Time: 2015-2016
Brief: Setting up point of service and fiber optical cable laying.

AIS

Customer: AIS
Project: IBC
Location: East of Thailand
Time: 2014-2015
Brief: Designing DAS, Organizing POI, Laying feeder cables.

TRUE

Customer: True
Project: SAQ
Location: East, North, and Northeast of Thailand
Time: 2017-Present
Brief: Acquiring the sites based on Site Area Map, Preparing the lease contract with landlord.

ERICSSON

Customer: Ericsson
Project: DTAC-Ericsson LTE implementation
Location: Central, East, and BMA of Thailand
Time: 2016-Present
Brief: Performing NodeB implementation.

ERICSSON

Customer: Ericsson
Project: True-Ericsson LTE implementation
Location: Central and South of Thailand
Time: 2017-Present
Brief: Performing NodeB implementation.